Technical parameters
Stadium on Krestovsky island, also known as the "Zenit arena", the only sports facility has a retractable roof and roll-out field, thanks to which it can be transformed into a platform for a variety of events. Complex engineering solutions used at the facility, making it not only one of the most technologically advanced in the world, but one of the most safe and convenient for visitors.
Interesting facts
icon
The highest stadium in Russia
The highest stadium in Russia: height without pylons — 75 meters, which allows to preserve high capacity and excellent visibility
icon
Experts from around the world
At the peak of construction there were involved 4,500 people from across the world – Russia, Belarus, Ukraine, Kazakhstan, Uzbekistan, Moldova, Austria, Switzerland, Germany, England, Serbia.
icon
Space for everyone
14270 places will be designed for active fans, 560 — for visitors with limited mobility and 104 skybox for those who want to spend time in the arena with special comfort
icon
Excellent infrastructure
The stadium will be located 8 dining 8 restaurants on 5 thousand places, 1109 and 1311 of the female and male toilets, including 46 for visitors with limited mobility and 85 staff
icon
32 thousand tons of metal structures
The weight of the steel structures of the stadium — 32 thousand tons, which is comparable 4 Afilename towers
icon
A lot of places
34 thousand meters is chair of the stadium, if they build up in one line, more than 300 football fields
icon
Huge roof
The roof area of the stadium — 71000 square meters, which is approximately 3 Red squares
icon
Roll-out field
Roll-out field, weighing 7000 tons, which includes a lawn, heating system and blowing, engines and metal frame will move outside of the Cup and Vice versa in just 4 hours
icon
More than Wembley
During the construction of the stadium was used 486 thousand cubic meters of concrete is 5.5 times greater than for the construction of Wembley
Roll-out field and sliding roof
Field
The combination of sliding roof and roll-out field will be one of the main know-how of the stadium. Box dimensions 120*80 m will move through a system of electric motors, pre-rising with the help of pumped air. During football games the field will be located inside the stadium, and for the period of concerts, exhibitions and competitions in other sports it will be located outside the stadium. This decision will allow to maintain high quality turf throughout the year and to avoid the need for repeated replacement, which is inevitable for classical football arenas. To maintain a constant temperature and humidity level field will be equipped with aeration system and electric heating. The time necessary for moving field and all concomitant treatments will be about 6 hours.
spb
Roll-out the new stadium
Roof
The retractable roof will ensure the admission of sunlight during the days when the football field will be located inside of the stadium, without the proper amount of sun the lawn will not grow. In addition, according to the regulations of FIFA, the matches should be held under the open sky and the presence of a sliding segment of the roof allows you to satisfy this requirement. But most importantly, the new stadium will create a comfortable environment for visitors at any time, including winter in the winter. The retractable roof is a complementary field with technology: it will provide the sunlight, in the days when the football field will be located inside the stadium. In addition, according to the regulations of FIFA, the matches should be held under the open sky. Sliding segment will satisfy this requirement and to ensure comfortable stay of visitors of the arena in the winter, at which time the roof will be closed.
IT infrastructure
Wireless access
Stadium on Krestovsky is a large - scale IT project, which takes into account all the needs and helps to realize all the possibilities of modern sports facilities. The area of the stadium will be covered with wireless Internet access (wi-fi): the capacity of the designed network – 436 access points. The network will provide unlimited access to Internet and internal media resources visitors VIP, VVIP and guests of the skybox. She will also be able to use the media and the staff of the stadium. In addition, the network will liaise with the arena staff of the situation centre.
Processing and transmission of data
Technological capacity of the stadium will provide 250 km of fiber optic networks. All information generated at the stadium will be stored in a single data center (ECOD) with a capacity of over 50 TB. Such a powerful infrastructure capable of supporting any of the current software application. The stadium will be deployed a data transfer system with 15 thousand ports, and two channels connecting to the Internet. To ensure communication of the safety systems have a separate line. The speed of information transmission between switches dubliany optical channels will be 10Gbps. Data transfer rate for connecting custom hardware – 1Gbps.
Payment and access system
Pay-and-pass system of the stadium - a unified hardware and software system for full automatic operation with the visitors of the arena. It is intended for information and reference services, providing specialized free and paid services and organization of control of access of spectators.
Using payment entry system will perform the following operations:
  • selling tickets, passes and cards using all possible channels, including the Internet and ticket operators;
  • control of access of spectators of different categories and recording of unauthorized access attempts;
  • monitoring devices and access control of spectators;
  • conflict resolution employees with automated input control;
  • accreditation of certain categories of visitors;
  • automation of Parking;
  • the results, receiving Parking tickets and collection of Parking fees;
  • automation of billing;
  • automation of power points;
  • providing sales of goods and services the stadium's cashless payment system;
  • the real-time display of system processes, including the process of filling the stadium;
  • the obtaining of statistical and analytical information about the visitors, their interests, and their attendance;
  • formation of financial-accounting information and transfer to the accounting system.
In the future, the system can be used to implement a system of customer loyalty.
The safety of the stadium
Surveillance
The facility will be mounted video surveillance system that allows you to follow any of the spectators from the input cordons of security to the place on the podium. System identificeret ticket, appearance and track record fan. Stands in the space of the stadium under construction will have a total of 600 cameras. The main objective of surveillance is to commit illegal acts and identify the perpetrators.
Security alarm
To protect against unauthorized penetration by unauthorized persons stadium the stadium will be equipped with the alarm system. The project provides about 3.5 thousand magnetic contacts installed on doors and Windows, about 200 detectors of broken glass and more than 1 thousand optoelectronic detectors, controlling the volume of the premises.
spb
Fire alarm
Fire alarm system designed to detect fire in the initial stage and generating control signals for the activation of the various systems. In case of a precedent in the stadium envisages a complex of measures: the notification and management of the operation (transition operation of the facility in emergency mode), the start-up of smoke extraction systems, shutdown of ventilation systems, Elevator control, shutdown of process equipment, etc. The system will be built on the basis of 16 fire stations, located in different parts of the building and connected to a local network, which represents one decentralized station. As sensors will be used more than 10 thousand and 2 thousand multi-sensor handheld detectors.
Fire extinguishing system
The facility will be installed several types of fire protection systems. In hardware - powder extinguishing in electrical gas fire-extinguishing and water - in all other areas. Spaces in the stands of the arena provided by the sprinklers and internal and external fenestration design (stained glass, Windows, doors) in case of activation of the system will be irrigated the water mist. One of the unique features of the facility will be fire fighting in the area of crowd - robotized fire complex. Upon receipt of the signal fire, the robot determines the location of the fire and makes automatic fire fighting sprayed water. The robot is equipped with "technical vision" consisting of the IR sensor with a scanner and a TV camera. He also has the intelligence: the definition of the target coordinates and guidance on the fire. The fire robots are connected to information network, managed through a Central console and integrated into a comprehensive security system.
The management of the stadium
A single control center
United center is a communications hub and management where responsible for the operation of the stadium staff will track the processes occurring in the arena and manage all engineering systems, reacting to any situation – both before the event, so in its process and after.
Monitoring system
The system monitors all subsystems: security systems, life support, fire protection, communication systems, informing the duty staff of the Center for monitoring and forecasting of emergency situations, on the daily management of the Unified state system of prevention and liquidation of emergencies (RSChS) on the occurrence of pre-emergency, emergency, emergency situations and fires. Even in crisis situations the communication system and the stadium management ensures that the object is guaranteed to be stable telephone communication between the operative-rescue services, special forces and headquarters for emergency situations. Monitoring system engineering (load-bearing) structures of the stadium is done in real time and allows you to track changes of state of engineering (bearing) structures.
Remote control system of the stadium
Automatic remote control system of the stadium is designed for centralized monitoring, dispatching and management near
engineering systems:
  • energy conservation
  • sports lighting
  • heating
  • heating
  • air conditioning
  • heating
  • boiler
  • thermal curtains
  • cooling
  • communication systems
  • ticketing system
  • technologies soccer field
  • gas fire
  • fire alarm
  • a retractable roof
  • roll-out field
  • elevators and escalators
Sports lighting
The arena will be installed specialised lighting that meets all the conditions for the comfort of players, spectators, judges and the work of the TV cameras. In particular, to reduce flicker during slow-motion replays and verzameling for spotlight and used electronic high-frequency ballasts. The draft sports lighting emergency TV coverage – continuous television broadcasts and normal conduct of the match in case of a power outage. The stadium will be provided power supply of the lighting system of the football field for the first special category using independent redundant power supply and uninterruptible power supply. Because of this, 100% of lighting fixtures are operational, providing not normalized luminance levels for 3 hours. Lighting of the stadium will take place on a special ring technical bridge that provides easy and convenient access to it at any time. The bridge is located in the space between the farms ("rails" on which moves razdvigaya part of the roof) and connected by a system of transitional radial bridges with exits on the roof.
spb
Disabled visitors
At the entrance to the stadium will be installed information boards with information for people with limited mobility, including indicating the direction to accessible entrance.
The stadium also provided:
  • special lobbies;
  • elevators;
  • ramps for delivery through the auxiliary transport means;
  • special control devices
To ensure accessibility for people with limited vision before every March of the stairs equipped with tactile warning signs. Stair treads equipped with a protective anti-slip contrast color angular profile at each stage across the width of the March. Bathrooms for people with limited mobility will be equipped with a call system staff duty staff. In places of stay of people with disabilities will include two-way communication with the dispatcher.
Energy-efficient solutions
Complex indicators describing the specific value of energy consumption, allow to relate the structure to energy efficiency class A++ (very high). All materials and technologies used for the construction of the stadium, environmentally safe and meet the high standards of the international certification system LEED: the cables, which does not release halogen during combustion (HF cable), energy saving lamps, etc. The equipment meets a high technical level of the project and has the highest class of energy efficiency through the use of the most advanced technological developments. In particular, OTIS lifts installed in the stadium, are equipped with a regenerative drive ReGen, which redirects the power generated, usually receiveyour as heat on braking resistors, back in the electrical network of the building. Thus, setting up a clean "green" energy, and energy savings can reach 40-75%.
spb
Key figures
  • 68,000 spectators
    the stadium capacity for football, the 80,000 — theatre and concert events
  • 24,000 people
    located on the lower tier of the stadium, 44,000 people on the top
  • 287 680 square meters
    the total area of the arena
  • 26 000 sq metres
    area of commercial premises
  • 2732 space
    Parking is located on site near the stadium
  • 230 seats
    Parking is inside the stadium